Our Successful Projects Across South Africa

  1. Projects and Case Studies

Belair Mall, Fourways - Fight Club

Commercial Renovation for Fight Club: Belair Shopping Centre, North Riding

Environmental Pro Construction (EPC) successfully executed a comprehensive commercial renovation at Belair Shopping Centre, transforming the former Work Central office into a purpose built space for Fight Club. The project required precision and adaptability to meet the client’s unique requirements while adhering to stringent industry standards.

Our scope of work included the removal of all existing brickwork, partitioning, aluminum frames, and ceilings to create a blank canvas. The floor was meticulously screeded to achieve a level finish, and a new wall was constructed with integrated soundproof panels to minimize noise transfer to the adjacent conference room. Plumbing was sealed, and electrical outlets were strategically prepared for streamlined future connections.

To enhance safety and functionality, we installed a compliant fire sprinkler system, reconnected the air-conditioning system, and implemented a suspended ceiling with precise grid work. The space was primed and painted to a high standard, and a contemporary aluminum double door was installed to complete the project.

This renovation reflects EPC's expertise in delivering high quality commercial solutions, combining efficiency, attention to detail, and a commitment to exceeding client expectations.

Fourways Golf Estate, Selbourne - PR Works

Environmental Pro Construction (EPC) successfully delivered a comprehensive commercial remodeling project for PR Works at Fourways Gardens Estate, creating a modern, functional, and professional workspace tailored to the client’s needs.

The project began with the careful removal of outdated carpeting, followed by meticulous floor preparation to ensure a flawless foundation. We installed premium Belgotex carpeting, renowned for its durability and aesthetic appeal, to enhance the overall ambiance.

Concurrently, a skilled team worked on constructing and finishing drywall frames and partitioning. These were expertly skimmed for a seamless finish, painted with precision, and complemented with skirting to achieve a clean and refined appearance. As part of the transformation, high quality wallpaper was applied strategically to add character and sophistication to the space.

To ensure a cohesive and polished interior, all damaged suspended ceiling boards were replaced, restoring the ceiling’s uniformity and enhancing the workspace's overall appeal.

This project highlights EPC’s dedication to excellence in commercial remodeling, combining technical expertise with an unwavering commitment to quality and client satisfaction.

Fourways Golf Estate, Selbourne

Case Study: Comprehensive Commercial Painting and Restoration at Selbourne Building, Fourways Gardens Estate

Challenge

The Selbourne Building at Fourways Golf Estate required extensive restoration and painting to address significant wear and tear. The exterior staircases and metal railings exhibited heavy rust, while the wooden beams showed signs of weathering. Numerous cracks in the plaster around the brickwork, both internally and externally, further compromised the building’s aesthetics and structural integrity.

Solution

Environmental Pro Construction (EPC) executed a meticulous restoration and painting project that revitalized the building while ensuring durability and visual appeal.

The process included:

Metalwork Restoration: All exterior staircases and railings were sanded down to remove rust and old coatings. Heavily rusted sections received a specialized rust inhibitor treatment, followed by priming and painting to achieve a smooth and protected finish.

Woodwork Preparation: Exterior wooden beams were carefully sanded, primed, and coated with a high quality varnish to enhance their natural texture and longevity.

Crack Sealing: All interior and exterior surface cracks were thoroughly sealed to restore the plaster’s structural integrity and create a smooth base for painting.

Painting: The building was painted both internally and externally using premium-grade paints, ensuring a flawless finish with enhanced resistance to the elements.

Outcome

The Selbourne Building now boasts a refreshed appearance with restored functionality. The metal staircases and railings are fully protected against rust, the wooden beams exude a polished and enduring finish, and the sealed cracks ensure a seamless and durable painted surface. This transformation not only improved the building’s aesthetic appeal but also extended its lifespan, earning high praise from the property management team and tenants.

This project underscores EPC’s expertise in delivering comprehensive painting and restoration solutions for commercial properties.

Scottburgh Mall, Amanzimtoti, Kwazulu - Natal

Case Study: Roof Slab Waterproofing at Scottburgh Mall

Challenge

Scottburgh Mall in Amanzimtoti, KZN, faced persistent water leaks from its roof slab, exacerbated by the challenging coastal conditions. The combination of high humidity, salt laden air, and heavy rainfall contributed to the deterioration of the slab, leading to leaks that disrupted operations in a retail store below and posed risks to property and merchandise.

Solution

Environmental Pro Construction (EPC) carried out a meticulous inspection of the roof slab, identifying three compromised areas that required immediate attention. To address the issue, a specialized waterproofing system was applied, followed by the installation of a durable bitumen torch-on layer for enhanced protection. This approach ensured the slab was well equipped to handle the harsh coastal environment and prevent future water ingress.

Outcome

The waterproofing measures successfully stopped the leaks, restoring the retail space below to full functionality. The bitumen torch-on system provided a robust, long lasting solution that could withstand the unique challenges of a coastal climate.

This case study highlights EPC’s expertise in adapting solutions to meet the demands of complex environments, ensuring long-term protection and client satisfaction.

Harbor Bay Mall, Simons Town, Cape Town

Case Study: Roof Slab Waterproofing and Rectification at Harbor Bay Mall, Simon's Town, Cape Town

Challenge

The roof slab of Harbor Bay Mall in Simon's Town exhibited significant water ingress into retail stores below, caused by improper leveling and inadequate drainage access. These issues threatened the structural integrity of the building and disrupted store operations, necessitating immediate and expert intervention.

Solution

Environmental Pro Construction (EPC) conducted a thorough inspection and assessment of the roof slab using specialized techniques to pinpoint compromised areas. Our team implemented a comprehensive waterproofing solution to restore the slab’s integrity while maintaining confidentiality regarding our proprietary methods.

Key steps included:

Rectification of Levels: We re-screeded the roof slab to ensure an adequate fall, enabling efficient water channeling to drainage points and mitigating pooling.

Waterproofing: Specialized waterproofing systems were applied to seal all compromised areas, providing a durable and water resistant barrier.

Surface Preparation: The slab was floated to a smooth finish, preparing it for potential tiling based on the client’s future preferences.

Outcome

The rectified roof slab now ensures proper drainage, eliminating leaks into the stores below and safeguarding the mall’s infrastructure. The smooth, finished surface offers flexibility for future tiling, enhancing the slab's versatility. EPC’s swift and effective execution minimized disruption to the mall’s operations, earning commendation from the client for our professionalism and expertise.

This project reinforces EPC’s reputation for delivering tailored waterproofing and rectification solutions that address complex challenges in commercial properties.

24 Wellington Road, Parktown

Case Study: Comprehensive Painting, Carpeting, and Renovation at 24 Wellington Road, Parktown

Challenge

The commercial property at 24 Wellington Road required a multi-faceted interior renovation to address aging infrastructure and enhance functionality. The project involved painting, carpeting, wooden flooring, plumbing corrections, and minor structural repairs, with the goal of modernizing the space for improved tenant satisfaction.

Solution

Environmental Pro Construction (EPC) undertook an extensive restoration process, ensuring a seamless transformation across three floors.

Interior Painting: Each floor was carefully prepared and painted using premium-grade paints to create a fresh, professional appearance.

Carpeting Installation: Old carpeting was removed, and floors were meticulously prepared. New Belgotex carpeting, known for its durability and style, was installed throughout all floors, providing a polished and cohesive look.

Wooden Flooring and Plumbing Repairs: Sections of wooden flooring were repaired and refinished, while compromised plumbing points were corrected to ensure full functionality.

Ceiling Repairs: Damaged suspended ceiling boards were replaced where necessary, restoring the uniformity and appeal of the interior.

Custom Joinery: Old, damaged cupboards were removed, and new cupboards were custom-built and installed to meet modern design and storage needs.

Roof Leak Repairs: Roof leaks were identified and rectified to protect the building from further water damage.

Outcome

The comprehensive renovation resulted in a revitalized commercial space that is both functional and aesthetically appealing. The high-quality finishes, durable materials, and attention to detail significantly enhanced the property’s value and tenant experience. EPC’s commitment to excellence ensured the project was completed on schedule and to the highest standards, earning the trust and satisfaction of the client.

This project highlights EPC’s ability to deliver tailored commercial renovation solutions that combine technical expertise with superior craftsmanship.

Lonehill Shopping Centre - Roof Repairs

Case Study: Roof Repair at Lonehill Shopping Centre

Challenge

A busy commercial property in Lonehill, namely Lonehill Shopping Centre, faced persistent disruptions caused by leaks from an improperly installed IBR roof. The rainy season worsened the situation, with water ingress impacting tenant operations and threatening sensitive equipment. The roof had a history of temporary fixes, with poor drainage and insufficient insulation adding to escalating maintenance costs.

Solution

Environmental Pro Construction (EPC) conducted a comprehensive assessment, uncovering improper installation techniques, inadequate flashing, and blocked drainage systems. To address these issues without exceeding the client’s budget, EPC developed a targeted repair plan:

Carefully removing existing IBR sheets to locate and fix leaks.

Reinstalling the IBR sheets with proper alignment and secure fastening.

Installing new flashing in critical areas to prevent future leaks.

Clearing and optimizing drainage systems for efficient water flow.

Enhancing insulation in accessible areas to improve energy efficiency.

Outcome

The repaired roof now effectively withstands Lonehill’s rainy seasons, eliminating water ingress and protecting tenant operations. Optimized drainage prevents pooling, and improved insulation contributes to lower energy costs. This was a cost effective solution, which extended the roof's lifespan without requiring a full replacement. Certain areas of the roof will have to be replaced at a later stage due to improper installation techniques.

Sandhurst Towers, Sandton

Case Study: Roof Slab Rectification at Sandhurst Towers Penthouse, Sandton

Challenge

The uppermost penthouse of Sandhurst Towers, overlooking Fredman Drive, experienced significant water ingress into multiple units below. The issue stemmed from improperly leveled roof areas and unregistered renovations made by the previous owner. Poorly installed and misaligned drainage points exacerbated the problem, causing extensive leaks and structural concerns.

Solution

Environmental Pro Construction (EPC) conducted an in-depth inspection and assessment of the roof slab. Using our specialized and confidential techniques, we identified multiple compromised areas that required immediate rectification.

Key steps included:

Drainage System Rectification: All improperly set drainage points were corrected and reconnected to the main outlets to ensure efficient water flow.

Leveling and Screeding: The roof slab was re-screeded to create an adequate fall, ensuring proper channeling of water to the adjusted drainage points.

Waterproofing: Advanced waterproofing systems were applied to seal all compromised areas. These methods remain proprietary and were executed with precision to maintain the integrity of the structure.

Outcome

The rectified roof slab now prevents water ingress, ensuring the protection of multiple units beneath the penthouse. The improved drainage system and proper leveling provide a long term solution to previous water management issues. This critical rectification enhanced the building's structural integrity and tenant satisfaction.

EPC’s expertise in addressing complex rectification challenges reinforces our commitment to delivering durable and effective solutions for high-end residential and commercial properties.

Re-roofing, Sandton

Case Study: Roof Replacement at Hyde Park Multi-Housing Complex

Challenge

The Hyde Park Multi-Housing Complex experienced widespread leaks affecting multiple units. The issues stemmed from a previous roof replacement where the original slate tiles were replaced with Harvey metal tiles. While lightweight, these tiles were easily dented, prone to damage, and improperly installed. The incorrect layout and compromised underlying woodwork further exacerbated the problem, necessitating a complete roof overhaul.

Solution

Environmental Pro Construction (EPC) conducted a comprehensive assessment of the roof structure, determining that it was sound enough to accommodate more durable roofing materials. After consulting with the client, we recommended replacing the Harvey metal tiles with Double Roman concrete tiles for enhanced durability and aesthetic appeal.

Key steps in the project included:

Removal of Existing Roof: The Harvey metal tiles and damaged underlying woodwork were carefully stripped and removed.

Installation of Underlay Membrane: A high-quality underlay membrane was laid across the entire roof surface to provide an additional layer of water resistance.

Reconstruction of Wooden Grid: A new wooden grid structure was constructed to accommodate the Double Roman concrete tiles, ensuring proper alignment and stability.

Tile Installation: The new Double Roman concrete tiles were meticulously installed, with special attention given to sealing critical areas such as chimneys.

Flashing and Finishing: Cover and ridge flashing were set in place to ensure a weather tight finish and prevent future leaks.

Outcome

The newly installed Double Roman concrete tile roof significantly improved the durability and functionality of the housing complex. The robust materials and precise installation eliminated leaks, enhanced the overall aesthetic, and increased the property’s value.

This project showcases EPC’s ability to deliver tailored roofing solutions that address structural challenges while ensuring long lasting performance and client satisfaction