Every project shown here was completed by our hands, for real clients across Randburg, Roodepoort, Krugersdorp, and the greater West Rand. From structural roof replacements to detailed renovations and waterproofing work , this is the standard we hold ourselves to. No filters. No shortcuts. Just honest craftsmanship you can trust.










































Roof Replacement - Hyde Park
Hyde Park Multi-Housing Complex: Roof Rectification & Replacement
The Challenge: Failing Harvey Tile Roof & Severe Water Ingress
The original Harvey tile roofing system at the Hyde Park Multi-Housing Complex suffered from widespread leaks, structural instability, and energy inefficiency. Key issues included:
Improper Installation – Incorrect fastening compromised roof integrity.
Material Weakness – Lightweight tiles prone to denting and weather damage.
Structural Weakness – Woodwork deterioration weakened load-bearing capacity.
Persistent Leaks – Poor flashing and underlay allowed water ingress, leading to costly tenant complaints.
Our Solution: Full Roof Replacement with Engineered Upgrades
Environmental Pro Construction executed a precision-engineered roof replacement, ensuring long-term structural stability, weather resistance, and improved energy efficiency. Key steps:
Safe Removal of Compromised Roof – Dismantling of Harvey tiles and moisture-damaged battens.
Reinforced Wooden Grid Installation – Pre-treated, SABS-approved timber framework for load distribution.
Double Roman Concrete Tiling – High-durability, weather-resistant roofing with superior thermal insulation.
Advanced Waterproofing Systems – Seam-sealed underlays, flashing enhancements, and air-vent installations for optimal performance.
Quality Assurance & Testing – Post-installation inspections validated leak-free performance and structural compliance with SANS 10400.
Project Outcome: Resilient, Leak-Free Roof System
✅ Fully resolved leaks and moisture ingress
✅ Reinforced structural framework
✅ Enhanced thermal insulation for energy efficiency
✅ Elevated property value and curb appeal
✅ 40+ years of expected lifespan with reduced maintenance




























































Roof Repair & Drainage Optimization - Lonehill Shopping Centre
Case Study: Roof Repairs & Ceiling Leak Prevention in Retail Zone
Project Scope:
Environmental Pro Construction (EPC) identified and resolved critical leaks, drainage inefficiencies, and insulation issues at the Lonehill Shopping Centre, a high-traffic commercial hub. Our targeted roof repair and optimization strategy extended the roof’s lifespan, eliminated water ingress, and improved energy efficiency.
Challenges:
Installation Defects
Severe water ingress causing damage to sensitive equipment.
Blocked drainage leading to ponding, leaks, and accelerated wear.
Poor insulation resulting in temperature fluctuations and higher energy costs.
Improper IBR roof installation and flashing failures causing ongoing water penetration.
System Degradation
Galvanic corrosion at dissimilar metal interfaces
23% of drainage outlets obstructed (vegetative growth + sediment)
R-value of existing insulation degraded to 1.2 (from original 2.5)
EPC’s Solution:
✔ IBR Reinstall: SANS 10164 alignment (±3mm), 6x fasteners/m², butyl tape seals
✔ Drainage: Added 12 scuppers (DN150), 2.5° fall, anti-root membranes
✔ Thermal: 50mm PIR (R-value 2.8), 82% SRI coating
Leak Investigation & IBR Roof Rectification: Removed damaged sections, corrected misalignments, and secured sheets using high-performance fasteners.
Flashing & Drainage Enhancements: Installed custom flashing and cleared drainage paths to eliminate ponding and future leaks.
Energy Efficiency Upgrades: Applied thermal insulation and reflective coatings to reduce heat loss and operational costs.
0 leaks (from 12/100m²)
<2hr drainage (from >48hrs)
1.4 W/m²K U-value (from 3.2)
10+ year lifespan (from 3-5)
Compliant: SANS 10400-L & 10164 | 10-year warranty
Outcome:
EPC delivered a structurally sound, leak-free roof system with extended service life, reduced maintenance, and improved operational resilience for Lonehill Shopping Centre.






























Roof Slab Waterproofing & Structural Rectification
Case Study: Penthouse Roof Slab Demolition, Drainage Overhaul & Waterproof Reinforcement
Project Location: Sandhurst Towers Penthouse, Fredman Drive, Sandton
Client: Property Management Body Corporate
Scope: Full Roof Slab Rectification, Waterproofing, Drainage Optimization
Project Challenge:
The uppermost penthouse unit at Sandhurst Towers suffered from persistent leaks, structural weaknesses, and drainage failures, a result of un-level roof slabs, misaligned outlets, and unregistered renovations by a previous owner. This compromised tenant safety, asset value, and long-term performance.
EPC’s Engineered Solution:
Environmental Pro Construction (EPC) implemented a precision-engineered rectification strategy that ensured structural integrity, waterproofing durability, and compliance with SANS 10400 standards. Key interventions included:
Drainage System Rectification: Corrected drainage deficiencies, reconnected outlets, and optimized flow for long-term water management.
Structural Slab Re-Leveling: Custom screeding and leveling eliminated ponding and future leak risks.
Proprietary Waterproofing System: Applied seamless, high-performance membranes designed for permanent protection.
Compliance & Testing: Conducted thermal imaging, moisture scans, and final retention testing to ensure zero infiltration.
Outcome:
EPC delivered a fully rectified, leak-free, structurally sound roof slab, restoring tenant satisfaction, property value, and long-term durability. The project is a model of engineer-certified workmanship, transparent reporting, and no-compromise waterproofing performance.
✅ Leak-Free Guarantee | ✅ Engineer-Backed Reports | ✅ Transparent Pricing | ✅ SANS 10400 Compliance










































Roof Restoration – Blairgowrie - Structural Repair & Leak Prevention
Case Study: Roof Rebuild After Severe Timber Rot & Water Ingress
Project Overview:
Environmental Pro Construction (EPC) was tasked with a complex roof restoration for a residential property in Blairgowrie, Johannesburg. The project involved addressing persistent leaks, timber rot, and improper drainage caused by a hidden dual roof system, a corrugated metal roof concealed beneath concrete tiles. Our team diagnosed the structural weaknesses and designed a long-term solution that preserved the client’s original tiles while reinforcing the roof’s structural integrity.
The Challenge:
The property suffered from:
✔️ Severe water ingress and ongoing leaks, especially in living areas.
✔️ Rotten timber structures compromising the roof’s load-bearing capacity.
✔️ Hidden drainage failures and misaligned valleys worsening water flow.
Our Solution:
✔️ Structural Repairs: Replaced rotten timber grids with a durable, properly aligned support system.
✔️ Drainage Enhancements: Corrected valley alignments and improved water management to prevent future pooling and seepage.
✔️ Tile Reuse: Carefully removed and reinstalled the client’s original tiles, maintaining visual consistency and reducing costs.
✔️ Comprehensive Leak Prevention: Installed high-performance waterproofing underlays and sealed all vulnerable junctions.
The Outcome:
A structurally sound, leak-free, and cost-effective roof designed for long-term performance and aesthetically restored using the original tiles.
✅ 100% Leak Resolution
✅ Long-Term Structural Stability
✅ Preserved Aesthetic with Sustainable Material Reuse




















Flat Roof Waterproofing – Amanzimtoti at Scottburgh Mall
Case Study - Coastal Roof Slab Restoration
Project Overview:
Environmental Pro Construction (EPC) successfully completed a high-performance roof slab waterproofing project at Scottburgh Mall, Amanzimtoti, KwaZulu-Natal, resolving persistent water leaks caused by coastal weather conditions like humidity, salt-laden air, and heavy rainfall. The comprehensive restoration ensured long-term durability, operational continuity, and minimal downtime for the retail space below.
Key Project Features:
Targeted Leak Detection: EPC performed a precision moisture survey using thermal imaging and moisture meter testing to pinpoint critical problem areas requiring immediate intervention.
Advanced Waterproofing System: Implemented a bitumen torch-on system combined with elastomeric coatings, offering UV and salt resistance, flexibility, and a 10+ year waterproofing performance guarantee.
Seamless Application: The team applied high-performance waterproof membranes with hydro-cleaning preparation, primer bonding, and a fully bonded finish, ensuring a sealed, resilient slab.
Minimal Business Disruption: Work was strategically scheduled to avoid extended downtime, ensuring business continuity throughout the project.
Project Outcome:
✔ 100% Leak-Free Protection
✔ Salt-Resistant, UV-Stable Waterproofing
✔ Long-Term Durability in Harsh Coastal Conditions
✔ Trusted by Commercial Clients in KwaZulu-Natal



















Flat Roof Slab Waterproofing – Simon's Town - Harbor Bay Mall, Cape Town
Case Study: Slab Waterproofing & Structural Leak Rectification for Coastal Retail Spaces
The Challenge: Structural & Waterproofing Deficiencies
The roof slab at Harbor Bay Mall in Simon's Town, Cape Town, exhibited severe waterproofing failures, including:
Inadequate Drainage Access – Improper slab leveling caused pooling.
Persistent Structural Water Ingress – Leaks disrupted retail spaces, affecting tenants.
Water Retention Zones – Uneven surfaces trapped moisture, risking long-term slab damage.
Aesthetic & Functional Concerns – Slab required prep for future tiling, ensuring lasting performance.
EPC’s Solution: High-Performance Rectification & Waterproofing Strategy
Environmental Pro Construction (EPC) delivered a three-phase rectification plan:
1. Structural Assessment & Problem Diagnosis
Moisture mapping, thermal imaging, and flow analysis pinpointed moisture ingress points.
Custom repair plan tailored to Harbor Bay Mall’s unique conditions.
2. Slab Rectification: Leveling & Drainage Optimization
Precision re-screeding ensured proper gradients for water runoff.
Advanced membrane systems applied for UV, weather, and traffic resistance.
Critical junctions and penetrations sealed with flexible waterproofing membranes.
3. Future-Proofing for Tiling
Smooth surface finishing for long-term durability and waterproofing integrity.
Project Outcome: Leak-Free, Durable Retail Spaces
Zero Water Ingress – Complete leak elimination restored tenant confidence.
Optimized Drainage – Waterfall design prevents erosion and standing water.
Long-Term Resilience – Engineered for extreme weather and retail traffic loads.
Future Tiling Ready – Multi-purpose surface for seamless tiling without compromising waterproofing.
✅ EPC’s Expertise ensured structural integrity, minimized business disruptions, and safeguarded retail operations.













































Waterproofing Project in Safari Gardens, Rustenburg
Case Study: Multi-Level Waterproofing & Surface Reinstatement
Challenge:
A luxury estate in Safari Gardens, Rustenburg, experienced severe water infiltration, damaging interior finishes and a temperature-controlled wine cellar. Key issues included:
Improperly leveled roof slabs causing water pooling and seepage.
Leaking decking slabs with inadequate moisture barriers.
Inefficient drainage systems and faulty channeling.
High risk of interior damage due to the sensitive climate-control system.
EPC’s Solution:
EPC implemented a precision-engineered, multi-level waterproofing strategy, featuring:
Advanced structural assessment, slope correction, and drainage realignment.
Seamless integration of UV-resistant coatings, premium membranes, and drainage enhancements.
Surface regrading, expert tiling, and protective sealants to enhance durability and waterproofing.
Tailored solutions addressing the wine cellar’s critical needs, ensuring long-term protection and climate stability.
Outcome:
The estate now features a moisture-protected, structurally sound environment, with seamless water management across all levels. EPC’s approach restored the wine cellar’s integrity, improved drainage efficiency, and safeguarded the estate’s long-term value.










































Structural Restoration at Sandhurst Towers, Sandton
Case Study: Restoring Concrete Integrity & Façade Stability on a High-Rise Tower
Project Scope: Structural Restoration, Waterproofing, Brickwork, Plaster Repairs
The Challenge: Structural Degradation & Water Ingress
Sandhurst Towers, a multi-story residential development in Sandton, faced critical structural issues caused by persistent water penetration. The primary challenges identified were:
Slab Damage: Water ingress weakened structural slabs, creating long-term stability concerns.
Brickwork Deterioration: Moisture infiltration led to cracked and weakened masonry joints, posing risks to the building’s integrity.
Plaster Degradation: Interior and exterior plaster surfaces exhibited blistering, peeling, and mold formation, requiring extensive removal and repairs.
Height & Safety Constraints: The high-rise structure demanded advanced scaffolding and access solutions to safely execute the restoration.
Without immediate intervention, the integrity of the building and the safety of its occupants were at risk.
EPC’s Expert Restoration Solution
Environmental Pro Construction (EPC) implemented a precision-engineered restoration strategy, addressing both the root causes and visible effects of water damage. The comprehensive solution included:
Specialized Scaffolding & Access Setup:
Secure high-rise worksite establishment with multi-story scaffolding.
Fall protection systems and load distribution plans compliant with SANS 10400-GB.
Comprehensive Structural Damage Assessment:
Advanced diagnostic tools including moisture mapping, thermal imaging, and adhesion/porosity testing for targeted repairs.
Precision Plaster & Brickwork Restoration:
Systematic removal of damaged layers to expose and treat compromised brickwork.
High-strength epoxy crack repairs to stabilize deteriorated slab connections.
Application of proprietary waterproofing coatings to seal brickwork and slab junctions against future moisture ingress.
Custom-formulated plaster mix for moisture resistance and seamless aesthetic integration.
Moisture Resistance & Performance Testing:
Simulated weather exposure analysis to confirm waterproofing efficacy.
Final load testing and slab reinforcement verification before project closeout.
The Outcome: Strengthened Structure & Lasting Protection
EPC’s expertise restored Sandhurst Towers to full structural integrity, ensuring:
✅ Elimination of water ingress risks for long-term durability.
✅ Reinforced slabs and brickwork for structural stability.
✅ Rejuvenated aesthetic appeal across interior and exterior surfaces.
✅ Extended building lifespan, protecting the investment for years to come.
EPC’s tailored restoration approach safeguarded the building’s future, delivering a safe, durable, and waterproofed structure for Sandhurst Towers residents.
















































Balcony Waterproofing in Fourways Gardens – Slab Repair & Sealing
Case Study: Slab Waterproofing to Eliminate Chronic Balcony Leaks
Project Scope: Balcony Waterproofing
The Challenge: Water Infiltration Due to Poor Surface Levels & Drainage
Persistent leaks caused water ingress into the patio below and the adjacent bedroom.
Incorrect surface levels led to water pooling and seepage.
Inadequate drainage and misaligned outlets intensified water retention.
Faulty aluminum fixture sealing allowed moisture penetration into the adjacent bedroom.
Compromised sealing and damaged brickwork weakened the structural integrity.
EPC's Comprehensive Waterproofing & Restoration Solution
1️⃣ Surface Preparation & Structural Assessment
Exposed & cleaned the concrete substrate.
Removed all existing materials, including tiles and screed.
High-pressure surface treatment for optimal adhesion of waterproofing layers.
2️⃣ Advanced Waterproofing & Drainage Rectification
Installed a fully sealed, multi-layered waterproofing system.
Applied specialized high-performance membranes.
Sealed around aluminum fixtures (doors & windows) to eliminate ingress points.
Reconfigured drainage outlets for optimal water flow and prevention of pooling.
3️⃣ Surface Finishing & Aesthetic Enhancement
Installed correctly pitched screed for proper runoff.
Laid high-quality, non-slip tiles for a durable, elegant balcony finish.
Conducted final quality control testing to ensure leak-free performance.
The Outcome: A Leak-Free, Structurally Sound Balcony
100% Water Infiltration Resolution – All leaks resolved, restoring interior and exterior areas.
Optimized Drainage System – Engineered for long-term water flow efficiency.
Superior Surface Protection – High-performance waterproofing and tiling for longevity.
Aesthetic & Functional Upgrade – Seamless, modern finish enhances property value.
Tailored to luxury residential standards.
































































Rising Damp Treatment in Eagle Canyon, Honeydew
Case Study: Structural Damp-Proofing
Project Overview:
Environmental Pro Construction (EPC) executed a comprehensive rising damp treatment at a prestigious luxury property in Eagle Canyon Golf Estate, Honeydew.
The project targeted severe moisture ingress, impacting the structural integrity and indoor air quality across walls, plaster, and foundation elements.
Specialized Moisture Management Strategy: EPC eliminated the root cause of damp through a targeted solution:
Long-term protection against water intrusion
Elimination of toxic mold growth
Prevention of foundational deterioration
The Challenge: Rising & Penetrating Damp Risks
This luxury residential property faced extensive damp-related challenges:
Rising Damp from Foundation Level:
➤ Moisture traveling upward via capillary action, threatening wall stability.Penetrating Damp:
➤ Water infiltration through walls, plaster, and structural joints, accelerating degradation.Toxic Mold Growth:
➤ Persistent damp created an ideal breeding ground for harmful mold, posing health risks.Aesthetic & Structural Damage:
➤ Peeling paint, plaster deterioration, and weakening of load-bearing walls.
EPC’s Strategic Damp-Proofing Solution:
1️⃣ Diagnostic Moisture Mapping & Foundation Assessment
Advanced Moisture Detection & Entry Point Identification
Hydrometer Testing – Tracked moisture levels across internal walls.
Infrared Thermal Imaging – Located hidden damp pockets in brickwork, plaster, and foundation walls.
Capillary Action Analysis – Mapped moisture travel routes from foundation sources.
2️⃣ Precision Excavation & Drainage System Implementation
Foundation-Level Remediation – Protected against long-term moisture ingress.
Excavation to Foundation Depth – Safely accessed and treated damp at the root.
High-Performance Drainage Installation – Redirected water away from structural walls.
Hydrostatic Pressure Reduction – Engineered diversion systems for ongoing protection.
3️⃣ Industry-Leading Waterproofing Application & Moisture Barrier Integration
Permanent Waterproofing for Rising & Penetrating Damp Prevention
Foundation Waterproofing System: Multi-layered membranes applied at below-ground level.
Damp-Proof Course (DPC) Injection: Installed an integrated moisture barrier within masonry.
4️⃣ Structural & Aesthetic Restoration for Long-Term Integrity
Reinforced Plastering & Surface Sealing – Moisture-resistant, custom-formulated plaster.
Final Surface Finishing: Seamless aesthetic restoration with premium-quality paintwork.
5️⃣ Quality Assurance & Post-Treatment Performance Testing
Rigorous Moisture Validation: Ensured complete success of treatment.
Structural Integrity Testing: Verified adherence to EPC’s strict standards.
The Outcome: A Permanently Protected, Damp-Free Property
✅ Complete Moisture Elimination – Rising damp issues fully rectified at the source.
✅ Enhanced Structural Durability – Foundations and walls reinforced for long-term protection.
✅ Healthy Indoor Environment Restored – Toxic mold eradicated, safeguarding occupant health.
✅ Long-Term Property Protection – EPC’s proprietary solutions guarantee decades of damp-proofing performance.






















































Commercial Renovation in Belair Mall, Fourways
Case Study: High-Performance Gym Conversion from Corporate Office Space
Project Overview:
Environmental Pro Construction (EPC) successfully executed a full-scale commercial renovation at Belair Shopping Centre, North Riding, Fourways, transforming an outdated office space into a specialized Fight Club training facility. The project balanced technical expertise, regulatory compliance, and client-specific performance requirements, while adhering to stringent South African building and safety standards.
Client Goals & Project Scope:
The client required a modern, open-plan facility tailored for high-impact fitness activities. Key objectives included:
Complete interior demolition to strip the space down to its structural core.
Precision floor screeding for a level and durable training surface.
Soundproofing solutions to minimize noise transfer to adjacent spaces.
Safety and compliance upgrades, including fire sprinklers and air-conditioning optimization.
Installation of a sleek, functional aluminum double-door entrance for enhanced accessibility and aesthetic appeal.
EPC’s Step-by-Step Execution:
Demolition & Site Preparation – Removed all brickwork, partitioning, aluminum frames, and ceilings. Precision screeding ensured a level surface for high-traffic durability. Plumbing and electrical systems were re-positioned for optimal layout.
Structural Enhancements & Soundproofing – Constructed custom-built partitions with high-density soundproof panels for acoustic control.
Safety & Compliance Upgrades – Installed fire-compliant sprinkler systems, modified HVAC for airflow efficiency, and integrated ceiling grids for aesthetic consistency.
Finishing & Aesthetic Upgrades – Applied high-quality coatings, modern finishes, and upgraded entry points with custom-designed aluminum doors to enhance security, accessibility, and visual impact.
Project Outcome:
The result: a high-performance, visually striking, and structurally sound fitness facility delivered on time and to specification, meeting client requirements for safety, functionality, and modern aesthetics.




























































Office Remodeling in Fourways Golf Estate, Selborne Building
Case Study: Office Floor Renovation & Functional Workspace Upgrade
Project Overview: High-End Commercial Office Refurbishment – PR Works at Fourways Gardens Estate
Challenges Identified:
Outdated carpets, damaged drywall, and aged ceilings diminished visual appeal.
Subpar acoustic conditions disrupted productivity.
Non-compliant finishes and limited durability posed long-term maintenance concerns.
EPC’s Solution: Precision-Engineered Office Transformation
EPC’s approach integrated specialist design, superior materials, and compliance-driven execution, delivering lasting results:
✅ Complete Flooring Overhaul: Outdated carpets removed and replaced with premium Belgotex carpet tiles, enhancing durability and visual appeal.
✅ Drywall Construction & Finishing: Installation of high-quality drywall partitions, skimming, and precision painting to achieve smooth, uniform finishes.
✅ Acoustic Enhancements: Upgraded ceiling grid and soundproofing to optimize noise control and improve workspace comfort.
✅ Lighting & Ceiling Restoration: Refurbished suspended ceilings, optimized lighting for visual consistency, and improved acoustic performance.
✅ Aesthetic Refinements: Applied high-end wallpaper and premium skirting for a polished, modern look.
Outcome: A Modern, Functional Workspace
The EPC team transformed PR Works’ office into a collaborative, aesthetically refined environment that balances comfort, efficiency, and long-term durability. The result is a vibrant workspace that supports business goals while maintaining high-end appeal.




























































Commercial Painting & Restoration – Selborne Building, Fourways Golf Estate
Case Study: Protective Coatings & Commercial Repainting for Structural Preservation
Case Study: Protective Coatings & Commercial Repainting
Project Overview:
Environmental Pro Construction (EPC) successfully executed a comprehensive exterior and interior restoration and painting project at the prestigious Selbourne Building, Fourways Golf Estate. The project addressed extensive structural wear, weathering, and aesthetic deterioration, ensuring long-term durability and enhanced resistance to environmental elements.
Challenges Faced
Severe Metal Corrosion: Exterior staircases and railings exhibited extensive rust and peeling coatings, requiring full restoration.
Deteriorating Wooden Features: Faded, cracked, and weathered exterior wooden beams demanded sanding, refinishing, and premium varnishing.
Plaster & Surface Cracks: Both internal and external walls showed visible cracks, threatening stability and visual appeal.
Outdated Paintwork: Faded and compromised coatings needed high-performance paint to restore uniformity and resilience.
EPC’s Strategic Restoration Approach:
Metalwork Restoration: Rust removal, industrial sanding, rust inhibitor application, and precision priming to prevent future oxidation. Finished with high-performance, anti-corrosion coatings.
Exterior Wooden Beam Refinishing: Meticulous sanding, protective primers, and UV-resistant varnish to restore natural grain, protect against weathering, and ensure long-term durability.
Crack Sealing & Surface Repairs: Structural integrity restored through advanced sealants and plaster reinforcements, ensuring a smooth, long-lasting finish.
Precision Painting & Finishing: Commercial-grade, weather-resistant paints applied for UV and moisture protection, achieving uniform aesthetics and maximum durability.
Project Outcome
Corrosion-free metalwork fully protected against rust.
Rejuvenated, high-quality wooden features with a polished, durable finish.
Structural integrity restored across surfaces, with reinforced plaster-work.
Flawless, uniform paintwork ensuring a long-lasting, visually appealing exterior and interior.














































Renovation & Restoration – 24 Wellington Road, Parktown
Case Study: Multi-Phase Interior Remodeling & Structural Reinforcement
Commercial Renovation Project
Project Overview:
Environmental Pro Construction (EPC) delivered a full-scale commercial renovation at 24 Wellington Road, Parktown, transforming an outdated, deteriorating building into a modern, high-functioning workspace. This comprehensive project involved painting, carpeting, wooden flooring restoration, plumbing repairs, ceiling refurbishments, and leak rectification, ensuring long-term durability and improved tenant satisfaction.
The Challenge:
The building faced significant infrastructure and aesthetic deterioration, including:
Faded, peeling interior paint undermining professional ambiance.
Worn-out carpeting & wooden flooring needing extensive refinishing.
Plumbing deficiencies affecting water supply efficiency.
Ceiling damage & structural wear compromising safety and consistency.
Roof leaks leading to water infiltration and long-term risks.
EPC’s Tailored Solution:
EPC implemented a step-by-step restoration plan:
Interior Repainting & Surface Preparation – Applied premium coatings for a polished, durable finish.
Carpet & Flooring Refurbishment – Replaced worn-out materials with premium Belgotex carpets and refinished wooden floors for long-lasting appeal.
Plumbing Rectification – Addressed malfunctions and optimized water systems for efficiency.
Ceiling Repairs – Reinforced structures and restored aesthetics.
Roof Leak Rectification – Conducted moisture mapping, repairs, and preventative coatings.
Outcome:
The result is a modernized, tenant-friendly commercial space with enhanced functionality, improved visual appeal, and restored structural integrity. The project underscores EPC’s commitment to precision execution, durability, and tailored solutions for commercial properties.












































Home Build – Wildtuin Park Estate, Krugersdorp
Case Study: NHBRC-Compliant Turnkey Residential Development
Project Overview:
Environmental Pro Construction (EPC) successfully completed a full-spectrum residential build at Wildtuin Park Estate, Krugersdorp. The project involved a ground-up custom home construction with complete compliance integration, adhering to strict South African building codes and client specifications. EPC’s team managed every aspect of the build from site preparation and foundation engineering to final finishing and regulatory approvals.
This transformation delivered a fully certified, durable, and energy-efficient residence that maximizes long-term investment value and ensures compliance with NHBRC standards.
The Challenge: Building a Fully Compliant, Future-Proof Home
This project presented key challenges:
Complex Construction Coordination – Managing multiple trades, permits, and phased approvals across a tight schedule.
Full NHBRC Compliance – Achieving structural warranty protections, energy efficiency standards, and CoC certifications for electrical, plumbing, glazing, and roofing.
High-End Finishes & Functionality – Meeting client expectations for premium interiors, durability, and long-term maintenance ease.
EPC’s Tailored Approach: Structured, Compliance-Driven Execution
1️⃣ Site Preparation & Foundation Engineering:
Precision site clearing, excavation, and soil analysis.
Engineered foundation construction to NHBRC standards.
2️⃣ Structural Framework & Load-Bearing Construction:
Reinforced load-bearing walls, roof trusses, and concrete slabs.
Designed for maximum structural durability and compliance.
3️⃣ Electrical, Plumbing & Mechanical Systems:
SANS-compliant electrical system installation with CoC approval.
Plumbing network execution for pressurized, code-compliant systems.
Energy-efficient ventilation and air-conditioning setup.
4️⃣ Premium Interior & Exterior Finishes:
Seamless high-quality plastering and painting.
Modern tiling, flooring, and bespoke cabinetry installations.
Durable, low-maintenance materials for long-term value.
5️⃣ Compliance & Handover:
NHBRC enrollment with 5-year structural warranty.
Municipal plan approvals, CoCs for electrical, plumbing, and glazing.
Final occupation certificate issued for legal residence.
The Outcome: A Certified, Future-Proof Home for Modern Living
✅ Flawless Construction Execution – On time, on budget, to spec.
✅ Full Regulatory Compliance – All certifications and approvals in place.
✅ Structural Warranty Protection – Longevity guaranteed.
✅ Premium Finishes – A modern, energy-efficient, and comfortable home.
✅ Client Satisfaction – Ready for move-in with peace of mind.






























Double-Story Home Build – Heritage Manor Estate, Krugersdorp
Case Study: Strategic NHBRC-Compliant Phased Home Construction
Project Overview:
Environmental Pro Construction (EPC) successfully executed a phased double-story residential construction project at Heritage Manor Estate, Krugersdorp. The project focused on delivering a structurally complete shell, built to plaster and roof level, to ensure NHBRC compliance and long-term structural durability.
This phased approach enabled the client to manage budget constraints effectively while allowing for future finishing flexibility at a later stage.
Client Challenge: Phased Construction
✅ End-to-End Structural Construction – From foundation to roof level, ensuring full structural integrity.
✅ Budget-Conscious Phased Execution – Allowing clients to complete the shell within their budget and finish later.
✅ NHBRC Compliance – Securing full structural certification and compliance for future occupancy.
✅ Municipal & Engineering Approvals – Managing all necessary permits and structural approvals.
✅ Key Achievements:
Delivered a robust, structurally sound double-story home shell.
Enabled flexible completion for finishing work at a later stage.
Balanced affordability, compliance, and long-term value.
Achieved NHBRC certification, ensuring legal and regulatory protection for the client.
Structural Waterproofing & Wall Rectification – Brackenhurst, Ekurhuleni
Case Study: Waterproofing to Stop Water Ingress & Restore Wall Integrity
Project Overview:
Environmental Pro Construction (EPC) successfully completed a comprehensive boundary wall restoration in Brackenhurst, Ekurhuleni. The existing wall showed severe water ingress, structural deterioration, and plaster damage due to poor slope design, moisture retention, and inadequate drainage systems.
Client Challenges:
Persistent Water Ingress – Continuous moisture exposure weakened the wall’s plaster and brickwork.
Structural Weakening – Water penetration compromised the wall’s integrity, risking long-term damage.
Poor Drainage Design – Inadequate slope and no drainage outlets allowed water to pool, exacerbating damp issues.
Surface Cracks & Bubbling – Visible plaster cracks and bubbling indicated underlying structural failure.
EPC’s Advanced Restoration Strategy:
Plaster Removal & Brickwork Treatment
Stripped saturated plaster to expose moisture damage.
Applied industry-leading waterproofing solutions for long-lasting protection.
Structural & Drainage Optimization:
Reinforced weakened brickwork using advanced masonry techniques.
Engineered slope adjustment for proper water runoff.
Installed strategic drainage outlets to prevent moisture retention.
High-Strength Re-plastering & Finishing
Applied durable, moisture-resistant plaster for superior adhesion and crack resistance.
Achieved a smooth, uniform finish that restored the wall’s aesthetic and durability.
Project Outcome: A Fully Protected, Structurally Reinforced Boundary Wall
100% Water Ingress Elimination – Comprehensive waterproofing and drainage adjustments stopped recurring moisture issues.
Enhanced Durability – Structural integrity restored for long-term stability.
Aesthetic & Functional Upgrade – The refreshed wall improved the property’s visual appeal and long-term value.
📍 Quick Links
🔹 Home
🔹 About Us
🔹 Our Services
🔹 Projects
🔹 Blog
🔹 Contact Us
📜 Legal & Compliance
🔹 Privacy Policy & Terms
📩 Contact Us
📞 Phone: 061 487 1705
📧 Email: info@enviropconstruction.com
📍 Service Areas: 📍 Service Areas: West Rand, Roodepoort, Randburg & Krugersdorp
🌐 Connect with Us
📌 Follow us on Facebook: Environmental Pro Construction
© 2017 - 2025 Environmental Pro Construction | Privacy Policy | Terms of Service
Operating Hours:
Monday - Friday: 7:00am - 18:00pm
Saturday: 8:00am - 15:30pm
Sunday: Closed
📌 Elderly Assistance: Priority roofing & construction services available 7:00 AM – 9:00 PM (Weekdays), 8:00 AM – 5:00 PM (Weekends)